 Maintenance need to be
carried out on the 14 metre high section of this power station. A custom ClimbSafe product was
constructed with a fixed rail system top and bottom so the frame could be moved. The job
was finished quicker with a saving of $50,000 for the contractor over traditional
scaffolding methods. |