      Custom Solutions
 

Maintenance need to be carried out on the 14 metre high section of this power station. A custom ClimbSafe product was constructed with a fixed rail system top and bottom so the frame could be moved. The job was finished quicker with a saving of $50,000 for the contractor over traditional scaffolding methods.

Roofing maintenance contracts easily won

Maintainence contract won
easily from contractors using traditional methods.


 